1.
Need
- Optimize the management and entry of materials into the plant
- Flow optimization in general
- Search for new solutions
2.
Process implemented
- Switching from pre-assembled materials to self-assembling packaging kits delivered flat
- Buffer stock warehouse within the company where Deles manages the materials
- Switching from a "call off" supply to a demand planning based on production schedules (daily)
- Consignment stock invoiced at the time of withdrawal
3.
Value generated
Single partner:
- Reduction of warehouse costs
- Reduction in the number of daily deliveries (from 16 trucks to 2 full loads)
- Reduction of transport costs and reduction of CO2 emissions
- -15% of transport / day